Capital Improvements

Capital Improvement Project Pipeline

Project Name Location Scope Status Estimated Start Estimated Completion
Tropical & Barton Infrastructure Improvements   Water, Sewer & Roadway Construction Phase Summer 2016

Spring 2017

Surficial Aquifer Test Well 17     Design Phase Fall 2016 Spring 2017
13th To 4th Ave. Between N & O Streets to Lakeside Watermain & Fire Hydrant Improvements  Design Phase Fall 2016 Spring 2017
High Service Pump 3 & 4  & Ammonia System Water Plant Water Plant Improvements Construction Phase Fall 2016 Spring 2017
Acid Dilution Project Water Plant Water Plant improvements Construction Phase Fall 2016 Spring 2017
11th Avenue South Greenway South A Street to South G Street Construction of greenway Contruction  Phase Summer 2016 Fall 2016
2nd Ave South – Dixie to Federal   Roadway Improvements Funding Phase October 2016  
2" Watermain Replacement Phase 1A   Watermain Improvements Construction Phase Spring 2016 Fall 2016
2" Watermain Replacement Phase 2   Watermain Improvements Design Phase Winter 2017 Summer 2017
10th Ave S to 12th Ave S, B to C Sewer   Sewer Improvements Contruction Phase Fall 2016 Spring 2017
Water Treatment Plant Upgrades & Improvements Water Plant WTP improvements Bid Phase Winter 2017 Summer 2017
WTP Chlorination System Water Plant WTP improvements Award Phase Winter 2017 Summer 2017
Flash Mixer Water Plant WTP improvements Design Phase Winter 2016 Spring 2017
Clearwell Structural improvements Water Plant WTP improvements Design Phase Fall 2016 Spring 2017
3rd Ave N Sewer Lining & City Wide Manhole Lining   Sewer & manhole lining Design phase Fall 2016 Spring 2017
Lift Station 16   Lift station improvements Design phase Summer 2016 Spring 2017
8th Ave S Watermain   Watermain Improvements Construction  Phase Fall 2016 Spring 2017
Lake & Lucerne Watermain   Watermain Improvements Design Phase Winter 2016 Winter 2017
Wastewater Pump Station #4 LW Municipal Golf Course Pump Station Replacement Construction Phase Summer 2016 Spring 2017
11th Ave N Sewer Lining   Sewer Lining & Replacement Construction Phase Fall 2016 Spring 2017
5th to 6th Ave Sewer Repair Between S. E to S F St Sewer & Watermain Improvements Construction Phase Summer 2016 Winter 2016
North K & North M Street | 2nd Ave N to 9th Ave N Aerial Utility & Roadway Improvements Design Phase TBD TBD
Tropical Drive & Barton Road Aerial Utility & Roadway Improvements Bid Phase Summer 2016 Spring 2017
North F Street | 5th Ave N to 10th Ave N Aerial Utility & Roadway Improvements Design Phase TBD TBD
15th N, 16th N 17th N, 18th N Terrace Drive | N A St to I95 Aerial Utility & Roadway Improvements Design Phase TBD TBD
N M Street | 9th Ave N to 18th Ave N Aerial Roadway Improvements Design Phase TBD TBD
11th Ave N | N L to Dixie Aerial Roadway Improvements Design Phase TBD TBD
22nd Ave N Aerial Roadway & Stormwater Improvements Design Phase TBD TBD
15th Ave N & Dixie Hwy Aerial Roadway Improvements Design Phase TBD TBD
Park of Commerce - Infrastructure Improvements Phase 1A   Construction of roadway, drainage, sewer mains, landscaping, pedestrian/bicycle ways. Design Phase TBD TBD
Fire Hydrants Map Life safety issue - installation of 66 new fire hydrants. In progress June 24, 2013 Ongoing
Lift Station 7 Force Main Map Installation of new sanitary line in sewer system.     Complete
5th Avenue South Bike & Pedestrian Trail Project Design
5th Ave S
Construction of bike & pedestrian trail. Design phase 2017  

 

Completed Capital Improvement Projects

Project Name Location Scope Status Estimated Start Estimated Completion
11th Avenue South Watermain Project South A Street to South G Street Construction of watermain improvements Complete Spring 2016 Summer 2016
6th Avenue South South A Street to Lakeside Drive Roadway and Sewer Lining Improvements Complete January 2016 June 2016
15th Ave S/ Fordham Drive   Sewer Lining     Complete
Seminole Manor Forcemain Seminole Drive & Lantana Road Sanitary Forcemain Improvements     Complete
Global Manhole Lining   Lining 100 Sanitary Manholes     Complete
10th Ave. S Roadway & Utilities (2 Projects) Map Construction of roadway, drainage, water & sewer mains.     Complete
14th, 15th Ave N & Crestwood Watermain Map Construction of new watermain & roadway reconstruction.     Complete
Lift Station 7 Force Main Map Installation of new sanitary line in sewer system.     Complete
Potable Well #16 Map New production well for drinking water per SFWMD permit.     Complete
Raw Water Main for Well #16 Map New watermain to serve proposed potable wells.     Complete
Lynn Way Stormwater Improvements Plans
1900 2nd Ave. N
Reconstruct ditch section for drainage improvement.     Complete
5th Avenue North Greenway Project 5th Ave N, North A St to North C St. Construction of Greenway & pedestrian trail.     Complete
7th Ave. South Roadway - Engineering Design Services South A St. to South F St. Roadway & drainage improvements     Complete
FPU Gas Main Renewal Project - Phase 1, 2 & 3. Plans Replacement of existing gas mains throughout the City     Complete
9th Avenue South - Greenway Project 9th Ave. South, S. B to S. F Street Construction of greenway & pedestrian trail.     Complete
Bryant Park Boat Ramp Parking Lot   Improvements to parking lot & drainage system.     Complete